In the fall semester of 2012 I completed by final studio project in the senior level design class IA 411. Taught By Dr. Nisha Fernando this course was project based and followed a series of steps to complete an integrated design for a multiuse Spa facility located in Seattle, Washington. In this post I will show and explain the different parts of each of the three required phases, explaining the design process and showcasing my final design.

Detail of the rendered floor plans as seen on the final presentation boards.
Detail of the rendered floor plans as seen on the final presentation boards.
Presentation model of the completed design

Presentation model of the completed design

Introduction

Harmonique is a multiuse health and spa facility tailored specifically to those with physical health concerns as well as t hose with visual and or hearing impairment.

The facility includes therapeutic spa spaces: massage therapy, medicinal bath treatment rooms, and saunas. Physical therapy spaces: yoga rooms, exercise rooms, and a small indoor pool. Public spaces: restaurant, café, art gallery, and retail store, as well as an administrative area with offices and a conference room.

The client is Spirit Health Spas Inc. which is a privately owned company who operate a number or heath and spa facilities. This is their first facility tailored to those with special needs. Their primary intention is “To create a facility that will generate unique hospitality services to the visitors as well as the Seattle community with a specific goal in mind: truly inclusive design” they also hope to achieve LEED Platinum certification.

This facility is unique because of the specific user group that it accommodates. HARMONIQUE must be specifically designed to include patrons with physical health concerns, visual impairment, and auditory impairment. This cutting edge design needs to address concerns such as circulation, accurate way finding, and personal safely as it relates to users with this particular set of limitations.

HARMONIQUE Health and Spa is located on the fringes of Seattle Washington on top of Kinnear Park. The structure itself is a new two story post and beam construction that is 40,000 square feet of symmetrical space with lots of glass windows. These windows boast views of the beautiful Puget Sound as well as the Seattle skyline. The building design also includes a garden on the roof and a healing garden on ground level. Kinnear Park is a relaxed private setting that is not completely isolated from the Seattle community.

Spirit Health Spas Inc. would like HARMONIQUE Health and Spa to be a unique and forward thinking entity. They would like the design to be contemporary, sleek, organic, fluid, innovative, and to include cutting edge technology and creating problem solving that results in a space that is both functional and beautiful to people from all walks of life.

PHASE ONE: DESIGN PROGRAM & CONCEPT DEVELOPMENT

Cover page only

Phase one of the project included four major components:

1) The Design Program: Introduction to the project, client purpose, project requirements, user groups, building and space analysis, and broad design goals.

2) Research Study and Case Studies: An in depth study of a designed environment that pays special attention to users with severe vision or hearing impairments, and 2 case studies on contemporary/modern health and spa facilities

3) Design Guidelines: Based on the research and case studies identify two or more critical design guidelines on each of the following topics: Easy way-finding and maintaining safety, Useful and efficient space planning, Enhancement of sensory experience as an inherent part of interior design

4) Concept Development: Develop a broad design concept for the entire project, state this in sketches and words.

Phase one was completed over the course of 20 days, concluding with a short concept presentation to the studio. The submission was completely digital. On this platform I will be adding the complete submission file as a link, but also will be adding short JPEG galleries of the separate components.  The purpose of this post is to show how much work goes into the final presentation, but I’m going to try and keep it easy to navigate and easy to understand!

Here is a short link to the PDF file: Phase One IA 411*

*Note, the document is 60 pages long

Design Program

Research Study

Case Studies: Gallaudet University & Burj Khalifa

 

Case Studies

Design Guidelines

Concept Development

Mood Boards

PHASE TWO: SCHEMATIC & FINAL DESIGN DEVELOPMENT

004

Phase two was the longest project phase and covered an extensive amount of material, including the delicate transition between the conceptual/schematic to the final plans. We had 49 days to complete the schematic development, the final drawing packet, and part of the project manual. The final submission for this phase included the following:

1) Logo Design

2) Schematic Design Development

  • Space Adjacency Matrix
  • Block Plans
  • Schematic Design Options
  • Space Standards.

3) Final Drawing Packet

  • Dimensioned Floor Plan
  • Floor Plan-Furniture Layout
  • Floor Plan-Behavioral & wayfinding Aspects
  • Furniture, Fixtures & Equipment Codes
  • Reflected Ceiling Plan
  • Electrical Plan
  • Schedules for Furniture, Fixtures & Equipment

4) Project Manual

  • Fire Safety and Codes
  • ADA Considerations and Codes
  • Product Documentation

LOGO DESIGN

SCHEMATIC DESIGN DEVELOPMENT

The Space Standards component of this phase is more tailored towards reference, but are still important and now a great resource. PDF file: Space Standards. Many of the images in this 56 page document come from “Human Dimension & Interior Space” a book by Julius Panero and Martin Zelink, I also used the “ADA Accessibility Guidelines for Buildings and Facilities” website: http://www.access-board.gov/adaag/html/adaag.htm. Both are fantastic reference tools for creating up to code ADA accessible facilities.

FINAL DRAWING PACKET

This was the longest and most involved part of Phase Two. The sheer amount of work that goes into creating a single floor plan is amazing. Having to draft six complete plans for this 40,000 sq. ft. two story building was a task to be reckoned with.

Final Plans Binder

Go ahead. Try to call me an interior decorator.(Above: My final CAD document with all layers turned ON. It is as if I took every single created floor plan and laid them one on top of the other.)

Go ahead. Try to call me an interior decorator.
(Above: My final CAD document with all layers turned ON. It is as if I took every single created floor plan and laid them one on top of the other. it’s illegible in this format, but looks very impressive.)

DIMENSIONED FLOOR PLAN

HARMONIQUE FINAL PLANS-Dimensioned GL

HARMONIQUE FINAL PLANS-Dimensioned 2
FURNITURE LAYOUT

HARMONIQUE FINAL PLANS-FURNITURE LAYOUT GL

HARMONIQUE FINAL PLANS-FURNITURE LAYOUT 2
BEHAVIORAL & WAYFINDING ASPECTS

HARMONIQUE FINAL PLANS-BEHAV. WAYFINDING GL

HARMONIQUE FINAL PLANS-BEHAV. WAYFINDING 2
FURNITURE, FIXTURES, AND EQUIPMENT PLAN

HARMONIQUE FINAL PLANS-FF&E FLOOR PLAN GL

HARMONIQUE FINAL PLANS-FF&E FLOOR PLAN 2
REFLECTED CEILING PLAN*

Reflected Ceiling Plan, Floor One(A RCP is created much like a floor plan, it is as if you are holding the hypothetical mirror up and recording exactly what would be seen providing details about different ceiling finishes and textures.)

Reflected Ceiling Plan, Floor One
(A RCP is created much like a floor plan, it is as if you are holding the hypothetical mirror up and recording exactly what would be seen providing details about different ceiling finishes and textures.)

ELECTRICAL PLAN*

HARMONIQUE FINAL PLANS-Electrical

ROOF GARDEN

roof garden CONCEPT

*Because I was working by myself on this project I was only required to do one floor of the Reflected Ceiling Plan and the Electrical Plan

PROJECT MANUAL

DSCF6918

The project manual was an ongoing document required to be complete at the end of Phase Three. Other than the presentation boards and the 3D model this was the only aspect of the entire project  handed in as a hard copy. Here I will include the short version: Fire Safety and Codes, ADA Considerations and Codes, and final Schedules. What I have removed from this forum is the product documentation. The manual itself is more than half documentation. 1-5 pages on EACH piece of furniture, each finish, each fixture, and each piece of equipment. Although it looks pretty all bound together and colorful for this platform a schedule will convey the same information. If you have comments or questions about any thing I specified please send me an email!

Project Manual Binder

PHASE THREE-FINAL DRAWINGS & PRESENTATION

Phase Three was in many ways the most intricate. We had around one month to complete two more drafted floor plans, one detail drawing, one elevation, a physical 3D model, presentations boards, and digital renderings. The presentation phase is always exciting to me because this is the part where everything that I can see so clearly in my head comes to life on paper. It is one thing to explain a design to someone, but another thing entirely to present a photo-realistic rendering of your exact design. What we can now do with computers, as well as what we were taught with pencil and marker, will always be magical to me. This is my favorite part of the design process and the part that I usually spend the largest amount of time perfecting.

This phase three was broken into several distinctive parts:

1) Final Drawing Packet: Finish Plan, Detail Drawing, and Elevation

2)  3D model

3) Digital Renderings

4) Presentation Boards

5) Digital Walk-through of the Space (This wasn’t an exact requirement, I added it early on for use as a digital presentation technique)

FINAL DRAWING PACKET (Part Two)

FINISH PLAN

DETAIL DRAWING: RECEPTION DESK

LOBBY ELEVATION

3D MODEL

DSCF6876

The 3D model is about 2’x2′ and was constructed out of museum board, wood dowels, metal rods, white paint, foam core, various glues, and plastic pirated out of a poster frame. The second floor is left without walls and the first is completely constructed. This was used in my final presentation to help demonstrate broad schematic design elements and way-finding techniques.

DIGITAL RENDERINGS

For these renderings I used a combination of Google SketchUP and AutoCAD.

AutoCAD 3D rendering of a medicinal bath treatment room overlooking the Puget Sound.

AutoCAD 3D rendering of a medicinal bath treatment room overlooking the Puget Sound.

View from the office entrance into the main lobby and reception atrium.

View from the office entrance into the main lobby and reception atrium.

Harmonique Model Restaurant Formatted for Blog

Ramp Formatted for Blog

Exersise (1)

NOTE: Some of the renderings are not easily showing up, if you click on the broken image it might open in a new window. Or, take a look at this PDF file: Renderings

PRESENTATION BOARDS

For my presentation I had three large scale material boards. Here they are all next to one another.

For my presentation I had three large scale material boards. Here they are all next to one another.

DIGITAL WALK THROUGH OF THE SPACE

This section of my Phase Three submission is my pride and joy. This is my favorite aspect of the entire project, and the one that gave me the most trouble! I used Google SketchUp with a little help from AutoCAD to create the 3D model, and a screen shot program called CamStudio to capture the video. I played the animation during my presentation while speaking and pointing out critical parts of the final design. Eventually I am going to add underscoring and voice over to better explain the design to those completely unfamiliar with the project. Until then it is going to remain silent.

Because WordPress is not allowing me to embed a video to this post you’ll have to follow a link to YouTube to see the animation…it’s worth it, trust me!

Harmonique Walk Through: http://www.youtube.com/watch?v=AmN9kjTmUmA

Harmonique Logo

Harmonique Logo

This final year of undergraduate studio class taught me many things, some were new and unexpected and others were old and brushed up. This is the first project that I completed start to finish by myself that included all of the parts that a real design project would have. Although the time we were given was brief, and the schedule compressed, this project really gave me an idea of what it would be like if I were a professional designer managing my own firm. And I loved it. I loved every sleepless moment of it and can’t wait for my next opportunity to arise.

Until next time,

Carolyn

546810_528671900485441_636671474_n

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s